Know where you’ll actually get connected.

GridMaus reads every network operator’s published capacity, scores each substation for your project, and turns the answer into an application you can submit.

GridMaus screening a site: map of nearby substations with scored results

The grid publishes the data. Nobody publishes the answer.

Network operators publish capacity in their own formats, on their own schedules, written for engineers. GridMaus brings it into one view, scores it the same way everywhere, and tells you what it means for your project.

Published headroomConnection queuesEmbedded capacityPlanned worksOperator forecastsFlexibility tenders
Live coverageUpdated monthly
5,050
substations scored
6
network operators
3,256
5-year forecasts

Everything between an address and a grid offer.

One answer per site, built from published data and checked against what operators actually offer.

Screen any site in seconds

Drop a pin or type an address. Every substation in range is scored for your size and type of connection.

1. Derby 11kV
NGED · Primary · 0.9 km
97
25.1 MW20.1 MW after 5 MW

Know your likely offer

Firm, flexible or constrained, with the lead time and cost to expect.

72%Firm
21%Flexible
7%Constrained
Lead time9–14 months
Indicative cost£180k–£320k

See where headroom is heading

Every monthly release is kept, with the operator’s 5-year forecast, so you see the trend and not just today.

RecordedForecastYour project needs

Learn from real offers

Log what the operator actually offered. Estimates sharpen with every offer logged.

Carry it through to submission

Readiness evidence, the application pack, offer review and acceptance deadlines in one pipeline.

Screen the site
Readiness evidence
Application pack
Submit to operator
Offer received

See it working.

Real screenshots from GridMaus, taken from a live screening of a real site.

The GridMaus pipeline: a project moving from screening to energised
From screening to energisedOne card per connection pointHeadroom over time

From an address to a submitted application.

Three steps, the same for a 2 MW battery or a 40 MW data centre.

1

Screen a site

Type an address or drop a pin. See every connection point in range, scored for your size and type.

2

Compare and shortlist

Probability, lead time, cost, flexibility value and upstream limits, side by side.

3

Build the application

Turn the chosen option into a submission-ready pack and track it through to the offer.

Built for anyone who needs a grid connection.

Energy developers know the jargon. Fleet, data centre and estates teams shouldn’t have to.

Solar and storage developers

Find export capacity and avoid sites that will sit in the queue.

EV fleet depots

Know whether a depot can charge its fleet before you sign the lease.

Data centres and industry

Screen large demand loads across regions in one go.

Consultants and advisers

Give clients a clear answer and a ready-made pack, faster.

The map is free. The answers are what you pay for.

Start on Explore at no cost and upgrade when you need full results on every site. Compare plans

Explore

Free, for a first look
£0free for ever
  • The map and headroom for every network we cover
  • 5 full screenings a month
  • Top 3 sites in Find sites

Team

For five people
£599a month
  • Everything in Pro, for 5 people
  • Application pack builder
  • Portfolio upload and logged-offer insights

Enterprise

For large developers
From £15ka year
  • API and single sign-on
  • Custom data and unlimited portfolios
  • Agreed in contract

Prices exclude VAT.

Talk to us.

Questions about coverage, pricing for a larger team, the API, or bringing GridMaus to a new region? Send us a note and we’ll reply by email.

hello@gridmaus.com
How we treat your data

We only use what you send us to reply to you. We won’t add you to a mailing list, and we never sell or share your details.

Read our privacy policy